Turn on your JavaScript! What is this, 1999?
Skip to Navigation
Skip to Content
menu
Terre Haute Cleanwater
CSO Problem
Overview
Combined Sewer System
Wastewater Facility
Regulatory Requirements
CSO Solution
Overview
Operational Plan
LTCP
Green Solutions
Stormwater
Projects
Projects
Gallery - WWTF Phase 1
Gallery - WWTF Phase 2
Gallery - CSO 9/10 Floatable Control Structure
Gallery - CSO 004/011 Floatable Control and In-Line
Gallery - Main Lift Station
Gallery - CSO 009/010 Consolidation Sewer
Gallery - Large Diameter Sewer
Resources
News
FAQs
LTCP Documents
Library
WWTF Phase II Gallery
Return to Projects
Foundation work
Sump Pit
Excavation lagoon backfill
Clarifier 1 foundation layout
Wall pipe
Basement wall forms
Clarifier 1 - 18 in Pipe Installation
Building shoring
Bringing in rebar
3x30 inch to 1x54 inch pipe fitting installation
3x30 inch to 1x54 inch pipe fitting installation
Installing manifold on east side of sludge storage tank building
Concrete for first slab section
Concrete for first slab section
Wall rebar mat for north wall of areation tank 2">
Placing stone base for MH
CMU walls
Removing wall forms and moving to the next section
Clarifier 6 foundation mat
Setting form supports on top of shoring towers
Base slab pour
Clarifier 6 slab pour
Shoring being constructed in tank 3
Shoring going up in tank 4
Securing wall panel
Concrete work
Installing 30 inch sludge pipin
Installing sludge line between Clarifier 6 and pump building
Excavating for 60 inch internal recycle piping
Backfilling 60 inch pipe along west side of aeration tank
Stone in parking lot
Grading around clarifier
Loading clarifier equipment into clarifier 6
Spraying body coat on tank
Process piping
Clarifier 1 equipment installation
Installing stainlesss steel piping
Installing center equipment in clarifier
Sidewalk ramp
Landscaping installation
Clarifier 6 north trough wall concrete pour
Placing concrete and installing walkway dowels for wall section
Installing wall dowels
Site lighting duct bank excavation
Wrapping tank
Preparing tank for body coat
Framing for piping on tank
Installing prime coat south
Excavating
Windows installed
Column footing backfill
Installing sewer line to return sludge pump building
Exterior brick work looking at NE corner of building
Placing fill on west side
Setting forms for wall section
Lining up jet mixing pumps with pipe
Installing rebar for basement slab
Valve vault _10 bars out of wall A to wet well sidee
Building 2 TPO roof installation
Tented masonry west wall
Tank 4
View from Inside looking at beam
Carpenters removing forms from previous pour
Pouring loading station 2 trench bottom
Pouring foundation for loading station
Placing block for UV building
Placing concrete for southeast wall section
Process piping in the basement
Installing rebar in tank 2 knee wall footing
South side of building 2 - window installation
Excavating for pipe in road south of digester control building.
Grouting inside of pumps
Masonry wall facade shot from northwest corner
Excavating for foundation
Placing stone and checking grade
Brick removal
Pouring floor slab in pump room
Basement slab pour
Backfilling a lift on western side of knee wall
Tank 2 backfill and compaction
Continuing rebar work on eastern boundary and interior footers
Cleaning pipe end off south side of blower building
Area 8 hanging 30inch pipe support
Working on gate control for structure
Pouring foundation walls
Foundation walls poured in northwest corner.
New internal recycle pump station installing 42inch discharge tubes
New internal recycle pump station installing 42inch discharge tubes
Installing reducers on twin 42 inch pipes south of headworks
Anoxic Tanks
Channel Covers installed in Clarifier
Existing Clarifier rehabilitated
Jet Mixing Header in Waste Sludge Holding Tanks
Jet Mixing Header in Waste Sludge Holding Tanks
New Blower Building
New Blower Building
New Clarifier
New Diffusers
New UV disinfection
New UV disinfection
RAS Pump Building
Rehabilitated Aeration Tanks
Waste Sludge Holding Tanks
Waste Sludge Loading Station
© Terre Haute Clean Water 2014