Turn on your JavaScript! What is this, 1999?
Skip to Navigation
Skip to Content
menu
Terre Haute Cleanwater
CSO Problem
Overview
Combined Sewer System
Wastewater Facility
Regulatory Requirements
CSO Solution
Overview
Operational Plan
LTCP
Green Solutions
Stormwater
Projects
Projects
Gallery - WWTF Phase 1
Gallery - WWTF Phase 2
Gallery - CSO 9/10 Floatable Control Structure
Gallery - CSO 004/011 Floatable Control and In-Line
Gallery - Main Lift Station
Gallery - CSO 009/010 Consolidation Sewer
Gallery - Large Diameter Sewer
Resources
News
FAQs
LTCP Documents
Library
WWTF Phase I Gallery
Return to Projects
Excavation for foundation
Sump pit
Foundation rebar
Placing concrete (basement slab)
Forming basement walls
Electrical conduit
Discharge structure
Discharge structure
Discharge structure
Basement wall rebar
Grit tank sump
Electrical conduit north of basement
Discharge structure
Grit tank sump rebar
East wall of basement
Discharge pipes (two 36" dia)
Grit tank sump
Excavation north of basement
Preparing ductile iron pipe
Screening room foundation
Rebar for screening room
Placing concrete - screening room foundation
Influent channel rebar
Grit tank rebar
Grit tank bottom rebar
Influent channel at screens
Structure (looking south to north)
Influent channel & grit tanks
Overhead view of grit tanks and influent channels
Electrical Conduit
Channel in to grit tank
Influent force mains
Placing concrete for column
Upper slab in screening room
Overhead (looking down at force mains)
Overhead view of grit tanks looking southwest
Overhead view of grit tanks looking northwest
Force main installation
Overhead view
Overhead view from northwest corner
Overview of building looking to the east
Grit tank with walls
Grit tank overhead view
Masonary block installation
Looking at overall buildng from the south
Construction of a bond beam
Screening room slab on grade
Finishing screening room slab on grade
View of screening room area from overhead
Overall structure
Lintels over windows
View of building from the west
Parshall flume in influent channel
Precast roof panels
Screening room with gates
Roof installation
Grit tanks and discharge structure
Effluent pipe installation
Roof installation on electrical room
View of influent channel
Gates at grit tank
Brick work and odor control unit
Main lift station force main
During construction
Inside completed headworks
© Terre Haute Clean Water 2014